The SPRI Industrial Cybersecurity 2026 call closed on 23-11-2026. This offer, formerly «Planta Segura», is no longer framed as a procedure for that grant. For future calls, always check with SPRI.
Plant Plan: an OT cybersecurity assessment for your plant
An OT cybersecurity assessment for industrial plants that cannot stop the line and whose customers already ask for proof of cybersecurity.
You leave with four things in hand: what is connected on your shop floor, which risks can stop your production, in what order to fix them, and what to answer your customer.
Priced per project, after a scoping call. No commitment.
Your plant runs, but nobody has drawn its network.
Your customer already sends you security questionnaires. Your maintenance team cannot stop the line to test anything. And nobody has told you, in order, what to fix first.
What is included
| No. | Deliverable | Format |
|---|---|---|
| 1 | OT asset inventory with Purdue model level | Spreadsheet and diagram |
| 2 | Prioritised risk report, ordered by impact on production, with an estimated cost to fix | PDF with an executive summary |
| 3 | IT/OT segmentation design and control of suppliers' remote access | Diagram and rule list |
| 4 | Recovery plan: configuration backups kept off the production network, and a restore drill report | |
| 5 | Answer to your customer's security questionnaire, with real evidence | Editable document |
| 6 | Awareness kit for plant staff | Short session and printable material |
Also included
- 3 months of HodeiShield Assure after the project.
- Security-questionnaire response template for suppliers.
Optional, quoted separately
- A pentest with an agreed window and scope so production is not put at risk (a Hodeitek service in its own right).
- A retest of what was fixed.
- 24/7 network monitoring, with a specialised partner.
Technical direction of the roll-out, if you hire it.
Scope
Inside the project
- One plant: one production site in the Basque Country.
- Assessment, inventory, risk analysis, segmentation design and recovery plan.
- Answer to your customer's questionnaire.
Outside, unless contracted separately
- Buying hardware and licences.
- Changes to PLC control logic and to process equipment configuration: your plant's integrator does those.
- IEC 62443 certification of a product or a plant: Hodeitek does not offer it. IEC 62443 and NIST 800-82 are the reference standards of our OT methodology.
- Pentest, retest and 24/7 monitoring (optional, quoted separately).
The process, step by step
How we work. Each step is put in writing before the next one starts.
- Scoping call (1-2 days). What is being protected, what is on the shop floor and which customer is asking you for proof.
- Signed scope. A document with the perimeter, the phases, who on your team takes part, and the delivery date for each phase.
- OT inventory without stopping the line. Passive network listening or tools proven outside production first, plus interviews with maintenance.
- Risks and design. A risk report ordered by impact, a segmentation and remote access design, and a recovery plan with its drill.
- Questionnaire and close. The answer to your customer, with real evidence, and a closing meeting where we walk you through each deliverable.
The project takes 6-8 weeks from kick-off to the final report, with a maximum per phase set in the contract. Every date is fixed in the signed scope.
Process guarantee
Before we start, we sign the scope, the phases and the delivery date of each one. If we deliver a phase late by our own fault, you are not billed for that phase.
We run no test that could affect your production without your written authorisation and an agreed window.
This is a guarantee about how we work, not about the outcome: we cannot promise that you will suffer no incidents or that you will obtain any certification, and we do not.
Who it is for, and who it is not for
It is for you if:
- You have an industrial plant in the Basque Country with connected production equipment (PLCs, SCADA, HMIs, robots or automated lines).
- You cannot stop the line to test anything.
- Your customer asks for proof of cybersecurity and you do not yet know what to answer.
- You want to know what to fix first, before buying anything.
It is not for you if:
- You want IEC 62443 certification of a product or a plant: we do not offer it.
- You want us to guarantee you will never have an incident: no serious company can.
- You only want to buy hardware or licences: that is outside the project.
- You need us to change your PLC logic: your integrator does that.
Who does it
Hodeitek, a cybersecurity company based in Aretxabaleta (Gipuzkoa), certified to ISO/IEC 27001 and to the Spanish National Security Scheme (ENS), Medium category, both issued by OCA Instituto de Certificación. Hodeitek is listed in the Basque Cybersecurity White Paper.
- ISO 27001: 34/5700/26/10159
- ENS, Medium category: 34/5704/26/09103
The work is done by an in-house team with a specialised partner.
The certificates cover their stated scope; they do not certify this offer or the security of your plant.
«The information systems supporting the delivery of the HodeiShield SaaS service (supply chain and compliance management, control, and traceability), penetration testing services (technical security auditing), cybersecurity consulting and technical consulting for ICT systems and services, consulting on AI applied to business, and consulting and design for business process automation including the technological infrastructure, technology services, and personnel required for their delivery in accordance with the current Statement of Applicability.»
Proof of project and grant management
We managed AZK Taldea's SPRI cybersecurity grant in January 2024, before the technical roll-out began. AZK is a branding agency, not an industrial plant, and it is not an OT case: we cite it only as proof of how we manage a cybersecurity project and its grant. See the AZK Taldea case
Price
Priced per project, after the scoping call, with scope and price fixed before we start. We do not publish a figure because it depends on your plant.
Before you call: the guide for plant managers
A 25-question self-assessment and a 12-month roadmap, with IEC 62443 and NIS2 explained for whoever is accountable for production. The PDF is in Spanish.
OT and industrial cybersecurity · Cybersecurity in the Basque Country
Frequently asked questions
What happens to the SPRI Industrial Cybersecurity grant?
Will you stop my production line?
How much does it cost?
How long does it take?
Do you guarantee I will have no incident or that I will pass an audit?
Do you certify IEC 62443?
What if my plant is outside the Basque Country?
Who does the work?
Request your plant assessment
Tell us where your plant is and what is on it. We will contact you to set the scope. It is not an order: there is no commitment.
We reply within 48 business hours.
Did you already apply for the 2026 SPRI grant with Hodeitek? Write to us to talk about execution after the award. Write to info@hodeitek.com